ST PANCRAS TICKET OFFICE

HPA were appointed by HS1 Ltd to undertake a feasibility study to reduce the existing ticket office by two thirds, to provide 2 retail units and a new ticket office. We were subsequently appointed via a design and build tender to the contractor.

slider Image
slider Image
slider Image
slider Image
slider Image
slider Image
slider Image
slider Image

Type

Retail

Location

London

Client

HS1

Status

Completed

Date

2016


This project comprised a ‘space-grab’ to reduce the existing ticket office by two thirds, and thus to unlock 2 additional retail units within the station. We developed the full construction information package required for contractor’s proposals to be signed-off. Construction of the new ticket office was completed in October 2016 and the retail unit shell works completed shortly afterwards.